Tesshire Drive Bridge over Gravois Creek
This project replaces a deteriorated three span bridge in St. Louis County with a new two span structure. Structures, Inc. was the prime consultant and provided the preliminary and final design for the new prestressed concrete NU-girder bridge. The bridge substructure consisted of integral end bents and a reinforced concrete intermediate bent supported on drilled shafts with rock sockets. This project was federally funded and designed in accordance with the LPA Manual.
![Tesshire Drive Bridge over Gravois Creek](/Portals/Structures-STL/Thumbnail_image/8390/0f8f9078-db72-4650-aa17-8d1f84c2757e.png)
Posted in: Bridge Projects